SERVICES/
Installation
Triton plants can be assembled as a compact unit, within a standard shipping container, or inside a machine room, from pre-assembled elements.
EASY INSTALLATION THAT ONLY TAKES 2 TO 3 DAYS.
The compact plants are subjected to workshop tests before being sent to the client, so once the container arrives you only have to connect the unit to:
➢ Feed supply (seawater, brackish water, leachate or industrial effluent, depending on the type of plant)
➢ Product water evacuation system
➢ Evacuation or collection system for brines or concentrates
➢ Electrical power supply
The plants that are assembled in a machine room are delivered pre-assembled in different components, taking between 1 and 2 weeks to install.